ORGANIZATION SETUP
SR. NO Particulars Employee.
1. Project Manager 04
2. Electrical Engineers (BE) 02
3. Civil Engineers : 02
4. Electrical Engineers (DEE) 03
5. Safety Officer 02
6. Safety Supervisor 03
7. Supervisors 10
8. Surveyor 04
9. Store Kipper 06
10. Skilled Electricians 06
11. Semi Skilled Electricians 08
12. Cable Jointer 02
13. Fitters 70
14. Welders 04
15. Helpers 80
Infrastructure Details with T & P.
SR. NO Particulars QTY
**** Vehicles
01 Bolero Campers 02 Nos.
02 Bolero SLX 02 Nos.
03 Tractors 08 Nos.
04 Hydra (Crane) 02 Nos.
**** Survey Equipments
01 Digital Global Position System (DGPS) 01 Set
02 Total Station for Survey 01 Set
03 Hand GPS 04 Set
04 Theodolites 04 Set
**** Equipment for Excavation and Foundation
01 Earth Excavators (JCB) with Rock Breaker 06 Nos.
02 Hitachi With Rock Breaker 01 Nos.
03 Generated Mixer Machine 08 Nos.
04 Water Tanker 08 Nos.
05 Vibrator 04 Nos.
06 Dewatering Machine (Pump) 05 Nos.
07 Template Jack for Setting of Template 40 Set
08 Chimney, Form Boxes and Shuttering for Foundation for various sizes up to 400Kv. Transmission line or other Civil work. 10 Gangs
**** Erection Tools for Erection of Tower up to 400Kv. Transmission line.
1 Derrick Pipe Heavy Duty for Erection 12 Set
2 PP Rope for various size 12 Set
3 Spanner Sex with Boxes 12 Set
4 Steel Wire rope required size 12 Set
5 Hammer Drill Machine 04 Set
6 Hand Drill Machine 04 Set
7 Welding Machine (3 Ph and 2 Ph) 05 Set
8 Gas Cutting Machine 03 Set
9 Grinding Machine 02 Set
10 Two Wheel Pulley 20 Set
11 Winch Machine 02 Set
**** Stringing Tools for Stringing of Conductor up to 400Kv. Transmission line.
1 Hydraulic Press Machine with Die Set (Manually) 04 Set
2 Hydraulic Press Machine with Die Set (Generated) 02 Set
3 Swivels - 16 Tons 10 Set
4 Pilot wire Connector - 18 mm 30 Set
55 Ground Roller 30 Set
6 Earthing Roller 30 Set
7 Thermometer 1 Set
8 Sag Scope 1 Set
9 Earthing Cable with Stick - 45 mm2 2 Set
10 Equaliser Pulley - 15 Tons 2 Set
11 Drum Lifting Jack - 6 Tons 4 Set
12 Steel Die set for Zeebra Conductor 4 Set
13 Aluminium Die set for Zeebra Conductor 4 Set
14 Come Along clamp with 7 Bolts (Zeebra conductor) 140 Set
15 Automatic Clamp - Zeebra Conductor 24 Set
16 Eath Wire Clamp with 3 bolts 8 Set
17 Earth Wire Flat Clamp 8 Set
18 Kitto Clamp 10 to 12 mm 4 Set
19 Kitto Clamp 14 to 16 mm 3 Set
20 Hydraulic Cutter with Spare Blade 3 Set
21 Single End Socks - Zeebra Conductor 14 Set
22 Double end Socks - Zeebra Conductor 24 Set
23 Single End Socks - Zeebra Conductor 18 Set
24 Double end Socks - Zeebra Conductor 9 Set
25 Sagging Winch - 10 MT Capacity 4 Set
26 Vertical Ladder-3 Mtr. Long with hook 6 Set
27 Ladder-Horizantal for Sagging -2 M ( Japani Design) 6 Set
28 Reel stand - Pilot Jack 6 Set
29 Shaft for Reel stand - Pilot Jack 6 Set
30 Turn table Roller Type (5 Ton Capacity) 2 Set
31 Safety Belt - Full body Harness 40 Set
32 Safety Helmet 60 Set
33 Single Sheeve Pulley - Open 20 Set
34 Single Sheeve Pulley - Closed 20 Set
35 Double Sheeve Pulley 6 Set
36 Four Sheeve Pulley 10 Set
37 Turn Buckle - 3 Ton 18 Set
38 Turn Buckle - 5 Ton 12 Set
39 Turn Buckle - 12 Ton 6 Set
40 PP Rope - 16 mm 5 Set
41 PP Rope - 12 mm 4 Set
42 Ms Wire Rope - 10 mm 4 Set
43 Ms Wire Rope - 16 mm 8 Set